Our account managers can assist large commercial, industrial, manufacturing and institutional customers determine the most economical service to satisfy their natural gas requirements:
-
End User Transportation service is typically utilized by large manufacturing and industrial firms, electric power generators, government institutions, universities, schools and hospitals, who wish to purchase their gas through an alternative supplier. DTE provides gas transportation and storage service and bills only for those applicable charges.
- Gas Sales service customers purchase their gas through DTE's Gas Cost Recovery (GCR) mechanism or through the Gas Customer Choice (GCC) program. These customers include smaller commercial businesses, schools, hospitals and housing complexes.
To contact an account manager, please email us at gasaccountmgr@dteenergy.com
| Gas Sales | End User Transportation | |||||||||||
| Service Type | Non- Residential | Multi- Dwelling | Multi- Dwelling | Large Volume | Large Volume | School | Small Volume Transport | Large Volume Transport | X-Large Volume Transport | XX-Large Volume Transport |
||
| Schedule No. | Rate GS-1 | Rate 2A Meter Class I | Rate 2A Meter Class II | Rate GS-2 <100,000 MCF | Rate GS-2 >100,000 MCF | Rate S | ST | LT | XLT | XXLT | ||
| Monthly Service Charge | $26.20 | $10.50 | $26.20 | $590 | $590 | $200 | $2,030 | $3,660 | $9,100 | $120,000 | ||
| Distribution Charge ($/Ccf) | $0.28370* | $0.12478* | $0.25394* | $0.20883** | $0.19559** | $0.21680** | $0.07963** | $0.06145** | $0.05451** | $0.01410** | ||
| Monthly U-16999 IRM Surcharge | $0.67 | $0.98 | $0.98 | $0.67 | $0.67 | $7.41 | $29.86 | $145.40 | $500.00 | $500.00 | ||
| Gas-In-Kind | Included in Distribution Charge | 1.66% | ||||||||||
| Cost of Gas | GCR or GCC | Alternative Supplier | ||||||||||
*Includes the Energy Optimization Surcharge effective 1/01/2013 through 12/31/2013 as approved by the MPSC’s 12/06/2013 Order; the 2011 UETM Surcharge, as approved by the MPSC, effective 11/01/2012 through 10/31/2013; and all applicable RDM Surcharges (refer to page 2 of the current gas rates using the link below).
**Includes the 2011 UETM Surcharge, as approved by the MPSC and is effective 11/01/2012 through 10/31/2013, and an Energy Optimization Surcharge effective 1/01/2013 through 12/31/2013 as approved by the MPSC’s 12/06/2012 Order.
The volume breakpoints listed below provide a general guideline for choosing the most economical service. Specific rate schedule requirements, multiple meters and other factors can influence selecting the gas service that is best suited for your business needs.
| Volume Breakpoints (100 Cubic Feet - Ccf/year) | |
| Commercial and Industrial | |
| Rate GS-1 to Rate GS-2 | 140,000 |
| Rate GS-1 to ST | 150,000 |
| ST to LT | 1,000,000 |
| LT to XLT | 7,000,000 |
| School | |
| Rate GS-1 to Rate S | 24,000 |
| Rate S to ST | 290,000 |
| Multi-Family Dwelling | |
| Rate 2A to ST | 160,000 |
Related Links

Electric Service