Our account managers can assist large commercial, industrial, manufacturing and institutional customers determine the most economical service to satisfy their natural gas requirements:

  • End User Transportation service is typically utilized by large manufacturing and industrial firms, electric power generators, government institutions, universities, schools and hospitals, who wish to purchase their gas through an alternative supplier. DTE provides gas transportation and storage service and bills only for those applicable charges.

  • Gas Sales service customers purchase their gas through DTE's Gas Cost Recovery (GCR) mechanism or through the Gas Customer Choice (GCC) program. These customers include smaller commercial businesses, schools, hospitals and housing complexes. 

To contact an account manager, please email us at gasaccountmgr@dteenergy.com

 

 Gas Sales End User Transportation
Service
Type
 Non-
Residential
Multi-
Dwelling
Multi-
Dwelling
Large
Volume
Large
Volume
School Small
Volume
Transport
Large
Volume
Transport
X-Large
Volume
Transport
XX-Large
Volume
Transport
Schedule No. Rate
GS-1
Rate
2A
Meter Class I
Rate
2A
Meter Class II
Rate
GS-2
<100,000 MCF
Rate
GS-2
>100,000 MCF
Rate
S
 STLTXLTXXLT
Monthly Service Charge $26.20$10.50$26.20$590$590$200 $2,030$3,660$9,100$120,000
Distribution Charge ($/Ccf) $0.28370*$0.12478*$0.25394*$0.20883**$0.19559**$0.21680** $0.07963**$0.06145**$0.05451**$0.01410**
Monthly U-16999 IRM Surcharge $0.67$0.98$0.98$0.67$0.67$7.41 $29.86$145.40$500.00$500.00
Gas-In-Kind Included in Distribution Charge 1.66%
Cost of Gas GCR or GCC Alternative Supplier

*Includes the Energy Optimization Surcharge effective 1/01/2013 through 12/31/2013 as approved by the MPSC’s 12/06/2013 Order; the 2011 UETM Surcharge, as approved by the MPSC, effective 11/01/2012 through 10/31/2013; and all applicable RDM Surcharges (refer to page 2 of the current gas rates using the link below).

**Includes the 2011 UETM Surcharge, as approved by the MPSC and is effective 11/01/2012 through 10/31/2013, and an Energy Optimization Surcharge effective 1/01/2013 through 12/31/2013 as approved by the MPSC’s 12/06/2012 Order.

 

The volume breakpoints listed below provide a general guideline for choosing the most economical service. Specific rate schedule requirements, multiple meters and other factors can influence selecting the gas service that is best suited for your business needs.

 

Volume Breakpoints (100 Cubic Feet - Ccf/year)
Commercial and Industrial 
    Rate GS-1 to Rate GS-2140,000
    Rate GS-1 to ST150,000
    ST to LT1,000,000
    LT to XLT7,000,000
School 
    Rate GS-1 to Rate S24,000
    Rate S to ST290,000
Multi-Family Dwelling 
    Rate 2A to ST160,000

 

Related Links

 

We DTE Twitter Facebook YouTube Channel
All contents ©  DTE Energy Company