The metering required for Electric Choice service is the same as that required for customers taking service on the equivalent Full Service rates.
Here's a quick summary of Electric Choice metering requirements:
Metering Equipment
- Secondary voltage customers may continue to use their current standard energy or energy/demand metering; or they may elect an optional interval-metered service at their expense.
- Primary voltage customers are required to have interval metering.
Meter Reading
- Standard energy and energy/demand meters will continue to be read by a meter reader on a monthly basis.
- Interval meters will be read through a customer-provided telephone line.
Interval Meter Phone Line Requirements
Electric Choice customers with interval meters are required to provide a working telephone line to the meter so that Detroit Edison can read the interval meters electronically. The customer can provide either a shared or a dedicated phone line. The customer is responsible for all costs related to the phone line.
- The telephone line must be installed and successful communication between the meter and Detroit Edison's data collection system must be verified before a customer may begin the interval-metered service.
- If customers fail to maintain a working phone line, Detroit Edison will read the interval meter manually for a charge of $37.00 per month after the first manual read.
- If the phone line fails for three consecutive months, Detroit Edison may change the meter service:
- Secondary customers will be switched from interval-metered service to standard energy meter or energy/demand meter service.
- Primary customers will be returned to Full Service, subject to the notice provision of the Retail Access Service Rider's Section 5.3. Term, Commencement and Return to Full Service.
- These requirements apply to all customers taking interval-metered Electric Choice service--all Primary voltage customers and any Secondary voltage customers electing Optional Interval-Metered Service. Refer to What You Should Know About Electric Choice Interval Metering* for more information.
Metering Cost and Minimum Term
Optional Interval-Metered Service Highlights:
- For secondary customers only:
- The monthly charge for Optional Interval Metered Service is
- $25.00/month for Business Electric/General Service (rate 110)
- $20.75/month for Business Electric with Demand/Large General Service (rate 112)
- The Optional Interval-Meter Service has a 12-month minimum term.
- The monthly charge and minimum term will apply for any interval meters installed after December 18, 2006.
- The monthly charge for Optional Interval Metered Service is
Primary Interval-Metered Service Highlights:
- All primary voltage customers are required to have interval meters
- There is no additional monthly charge; an interval meter is already required by--and included in--their Primary rate.
- There is no separate minimum term for Primary Interval-Meter Service. The minimum term for your Primary electric service applies.
* To view and print this information, you need Adobe® Acrobat® Reader.

Customer Choice