A decade ago, DTE Energy embarked upon a massive project to install new emissions control systems at the Monroe Power Plant. As part of that project, two new stacks have been built to replace the original 800-foot exhaust stacks. New stacks are required because of the moisture that is added to the exhaust by the new emissions reduction process.

We DTE Twitter Facebook YouTube Channel
All contents ©  DTE Energy Company