If you have read over all the steps for the interconnection process, and you verified your equipment is approved by checking the equipment list, or you have called the interconnection hotline 313.235.4333 to verify your equipment is approved per the UL 1741 Scope 1.1a standards, then select the application below that fits your generation needs.
Category 1 Interconnection/Net Metering Application* - for Inverter based projects tested to IEEE 1547.1 and in compliance with UL 1741 with a capacity of 20kW or less - Necessary for all customers installing generation.
Category 2 Interconnection Application* - for all projects with a capacity of more than 20 kW but less than or equal to 150 kW and for all non-inverter based or non-IEEE 1547.1 compliant projects under 20 kW - Necessary for all customers installing generation.
Parallel Operating Agreement* - for projects with a capacity of 20kW or less - To be executed once you have received a letter from Detroit Edison stating your application and all necessary studies have been completed per Detroit Edison.
Applications and agreements should be mailed to:
Interconnection Coordinator
323 SB
DTE Energy
One Energy Plaza
Detroit, MI 48226
* To view and print this information, you need Adobe® Acrobat® Reader.
Related Links
Overview of the interconnection process - High level step by step description of the process, roles, and responsibilities.
Detailed Interconnection Requirements - Detailed information regarding your specific customer generation project, which includes technical requirements.
Equipment list* - Detailed listing of equipment previously inspected by Detroit Edison for use on current interconnection projects.
References - Helpful Web sites to complete your project.
Applications and Agreements - When you are ready to move forward with your project to interconnect and operate generation in parallel with Detroit Edison complete the application.
Active Interconnection Project Status* - Status by Queue Number of all active interconnection projects.